liuyi
08/12/17 02:48AM
floor should be brushing
the floor should be polished after grinding, grinding should follow the direction of grain, grinding the total should be controlled within 0.3 ~ 0.8mm. 10, single-storey floor of the floor must be flat, no oil. Paving should be in the grass before the layer of thin and uniform primer to improve the adhesion.
Paving when the grassroots and the back of the floor should be brushing, to be sticky and then paving stickers. Puzzle when the application of hammer pad wood block beat tight, slit not more than 0.3mm. Spilled glue should be cleaned in time.
strengthen the composite flooring pavement should meet the following requirements: 1, moisture-proof cushion should be full of flat, seams can not be stacked.
" [url=http://outdoorwaterproofdeck.com/outdoor-fence/2272.html]low cost flooring ideas using salvage materials[/url] , [url=http://outdoorwaterproofdeck.com/wpc-floor/3408.html]ecological wood composites floor suppliers[/url] , [url=http://outdoorwaterproofdeck.com/cheap-pavilion/467.html]vinyl panel deck roofs[/url] , [url=http://outdoorwaterproofdeck.com/cheap-pavilion/4134.html]wood plastic composite floor in france price[/url] "
1


Reply | Forum Index